
CHEVAL CALICO HOUSE
Bathroom Refurbishments
SECTOR
SECTOR
LOCATION
LOCATION
SERVICE
SERVICE
SECTOR
Hospitality / Hotels
LOCATION
City of London
SERVICE
Internal Refurbishment
PROJECT OVERVIEW
DELIVERING 20 BATHROOM REFURBISHMENTS ACROSS A LIVE, OCCUPIED RESIDENCE WITHOUT A SINGLE SCHEDULING OVERRUN.
JFS was appointed by Cheval Residences to carry out a full bathroom refurbishment programme across 20 apartments at Calico House. Working within a live, occupied building, the project was carefully phased to minimise disruption to neighbouring apartments and ensure residents experienced as little downtime as possible.
The scope of works included full replacement of tiled flooring, installation of new shower enclosures and shower sets throughout. With apartments pre-booked by guests, a detailed delivery programme was agreed and maintained from the outset — ensuring every unit was completed on schedule and handed back ready for occupation.

SECTOR
LOCATION
SERVICE
WORKS UNDERTAKEN
FULL REPLACEMENT OF TILED FLOORING
INSTALLATION OF NEW SHOWER ENCLOSURES
INSTALLATION OF NEW SHOWER SETS
WATERPROOF TANKING
SILICON SEALANT
REDECORATION
















