top of page
8.png

CHEVAL CALICO HOUSE

Bathroom Refurbishments

SECTOR

SECTOR

LOCATION​​

LOCATION​​

SERVICE

SERVICE

SECTOR

Hospitality / Hotels

LOCATION​​

City of London

SERVICE​​

Internal Refurbishment

PROJECT OVERVIEW

DELIVERING 20 BATHROOM REFURBISHMENTS ACROSS A LIVE, OCCUPIED RESIDENCE WITHOUT A SINGLE SCHEDULING OVERRUN.

JFS was appointed by Cheval Residences to carry out a full bathroom refurbishment programme across 20 apartments at Calico House. Working within a live, occupied building, the project was carefully phased to minimise disruption to neighbouring apartments and ensure residents experienced as little downtime as possible.

The scope of works included full replacement of tiled flooring, installation of new shower enclosures and shower sets throughout. With apartments pre-booked by guests, a detailed delivery programme was agreed and maintained from the outset — ensuring every unit was completed on schedule and handed back ready for occupation.

SECTOR

LOCATION​​

SERVICE

WORKS UNDERTAKEN

  • FULL REPLACEMENT OF TILED FLOORING


  • INSTALLATION OF NEW SHOWER ENCLOSURES

  • INSTALLATION OF NEW SHOWER SETS


  • WATERPROOF TANKING

  • SILICON SEALANT


  • REDECORATION


PROJECT GALLERY

JFS Property Services Limited_Final_72 (

Head Office

25 Silk Mill Business Park

Brook Street

Tring, Herts

HP23 5EF

Logistics Hub

Bowood Lane
Wendover, Bucks

HP22 6QA

Socials

  • Instagram
  • LinkedIn

Accreditations

SSIP Supplier logo (Colour).png
1.png
chas.png

RELATIONSHIP LED

DELIVERY FOCUSED

MINIMAL DISRUPTION

END-TO-END CAPABILITY

Maintaining spaces that work.

© 2026 JFS Property Services Limited.

Part of JFS Group Holdings Limited.

bottom of page